Utilities — Steam and Power: Generation
and Distribution
At The Fitch Company, we understand steam,
and steam power distribution, with particular expertise in boilers and
boiler combustion controls. We know that since boilers produce a
utility and not a product, many are allowed to operate with older,
unreliable controls and instrumentation, and need to be upgraded.
Others need upgrades because of environmental issues.
The Fitch Company tackles boiler upgrades
like any automation project - by first understanding how the process
currently operates. We survey the existing control system, field
instruments and motor interlocks. We develop a P & ID of the boiler
and related processes and determine how the boiler is currently
controlled. We then depict the strategy using standard Scientific
Apparatus Manufacturers Association (SAMA) documentation.
Next, we specify any new instrumentation as
well as new control hardware required for either the boiler controls or
the burner management system. For BMS upgrades, The Fitch Company
provides detailed design, construction coordination, and start-up
services. We then develop the wiring diagrams needed for installation
and a new boiler control strategy that uses the existing system as a
base and incorporates input from boiler operators.
The Fitch Company has developed and
programmed boiler systems using Valmet, Honeywell, and Siemens control
systems. Since boiler upgrades typically necessitate a change from
panel-based indicators and controls to CRT-based graphic displays, we
provide operator training to assist with the transition.
We also provide around-the-clock attention
from our design and programming engineers for every boiler start-up,
and test the boiler operation at several loads and through several
upset conditions to verify that the control strategy is tuned to handle
"normal" plant operation. We then finalize the record drawings for the
upgrade and file all documentation with your facility.
Major projects include
- Recovery Boiler Controls upgrade
MeadWestvaco
Rumford, Maine
C-Recovery Boiler DCS Upgrade
Responsible for project budgeting,
hardware design, and PLC software development of new Honeywell DCS and
Allen Bradley PLC based control system for replacing existing TDC2000
and hardwired controls. Project included 310 instrument loops, 160
motor loads, eight electrostatic precipitators, and hundreds of
discrete devices, including solenoid valves, limit switches, proximity
switches, and process switches.
- Power Boiler DCS upgrade
Domtar Industries
Woodland, Maine
No. 9 Power Boiler DCS and BMS upgrade
Responsible for project budgeting,
burner management system specification, instrument specification,
detailed design engineering, Honeywell DCS and IPC configuration,
construction coordination, and commissioning for the migration of panel
based controls to a Honeywell TDC 3000 system. Project included 100
instrument loops (with new field instrumentation), 60 motors, 6 oil
guns, and 4 hog fuel feeders, on a 450,000 #/Hr power boiler.
- Cascade Evaporator Controls upgrade
Domtar Industries
Baileyville, Maine
Evaporator DCS Controls Migration
Recovery Boiler ESP System Upgrade
Controls upgrade of the cascade evaporators including design,
configuration, checkout, and start-up.
- BLRBAC upgrade - Recovery Boilers
Packaging Corporation of America
Counce, TN
Upgraded boiler control logic on
two 200,000 #/Hr. Kraft recovery boilers to meet BLRBAC standards.
Included interface to new A-B flame safety burner controls. Auxiliary
burners used No. 6 fuel oil and liquor with Natural Gas igniters.
Designed needed upgrade to fuel and gas valve trains to meet most
recent NFPA boiler requirements. Coordinated work between burner
management supplier, boiler upgrade company, and client.
- Combustion Air Flow
Public Service Company of New Hampshire
Schiller Station, Portsmouth, NH
Design & Implementation of No.
6 Boiler Combustion Air Measurement System. Coal Pulverizer Air Heaters
Study. Design and implementation of S-3 cooling System.
- Rapid blow down systems & drum level
International Paper Co.
Androscoggin Mill, Jay, ME
N0.s 1 & 2 Recovery Boiler Rapid Blow-down Upgrade. Power Boilers Drum Level Upgrade. Mill-wide Steam and Condensate Study.
- Turnkey boiler controls upgrade
Kimberly Clark Inc.
East Ryegate, VT
Designed, specified, and started up
new boiler controls and flame safety system for a 25,000 #/Hr. boiler
burning No. 6 fuel oil with propane igniters.
- Cogen controls
Groveton Paper Board
Groveton, NH
Plant-wide study of steam
distribution system and upgrade recommendations prior to installation
of cogeneration facility. Designed cogeneration controls and
recommissioned and started up of two 100,000 #/Hr. power boilers.
- Steam metering
Massachusetts Institute of Technology
Cambridge, MA
Designed and installed steam
metering systems for 12 buildings on the Cambridge campus. Short piping
runs required special metering techniques.
- Boiler Flame Safety Upgrade
Champion Paper Co.
Courtland, AL
Contact us for more information.
More Specialty Applications
TOP
|